The Barrick Goldstrike Mine in Carlin, Nevada, recently designed a retort expansion. Brahma was responsible for a large part of the construction for the project.
We commissioned a brand new retort and rebuilt three existing retorts; we also sat three tanks and a condenser. We fabricated and installed approximately 15,000 feet of high-pressure piping and supports. Brahma supplied a number of quality craftsmen to this project, and high pressure testing passed successfully in the very first round. Brahma currently provides electrical labor for the expansion and is responsible for the construction of the structural steel on the project. The retort expansion is projected to finish successfully and on time.