Brahma was responsible for the entire mechanical, electrical and instrumentation scope of work on the Barrick POX Offgas project. We constructed everything above the foundation including structural steel placement, stationary and rotating equipment setting, large ductwork, piping and inline instrumentation. We installed the control and main power circuitry, as well as the insulation and water tower. We utilized our precision to ensure the existing systems tied into the new capital work efficiently, allowing for a successful capital project.
The success of the Offgas project stems from the close communication and relationship between Brahma and Barrick. Brahma gave the project detailed attention and placed the correct personnel to ensure the success of the project. We monitored scheduling and costs closely and ensured QA/QC personnel were active on site.
The POX Offgas project allowed Brahma to show its skill in precise execution. We are presently performing routine maintenance and capital construction to the mine.